Tough rib roof panel fastener layout east read more.
Tough rib metal roofing installation.
A high tensile steel core allows tuff rib to easily handle the high winds throughout florida and even miami dade hurricane zones.
Substrate needs to be a minimum of 15 32 plywood that is apa rated.
Work up from the initial row starting at the lower corner in a diagonal pattern staggering the shingles to prevent gaps.
Measure one panel width in from the roof edge.
0 agricultural 1 cladding 2 commercial 3 exposed fastener 4 exposed fastener roof 5 roofing 6 roofing 7 8.
At this point chalk a line from ridge to eave.
An integrated anti siphon groove on panel laps allows tuff rib to be installed on roofs as low as 2 5 12.
Tuff rib panel installation specifications.
For slopes lower than a 3 12 pitch lap sealant is suggested on the side laps of the panel.
It is extremely important that this panel be laid square to the eave and ridge so that the remaining panels will line up square on the roof frame.
Tough rib roof endlap details.
A metal roof which does not have a plywood or other deck beneath it is not recommended.
Installation guides tough rib.
Roof slope must be a minimum of a 2 12 pitch to use this product.
An integrated anti siphon groove on panel laps allows tuff rib to be installed on roofs as low as 2 5 12.
Metal roofing is also available in the form of shingles.
Strong 3 4 trapezoidal ribs enable installation over solid deck and open frame applications.
Lay the starter row of metal shingles at the drip edge and affix to the roof with metal roofing nails.
Features benefits easy to order trim and accessory packages available in the same gauge and colors as the panels.
Tuff rib is at home on residential applications but functions well as a light commercial panel as well.
Tuff rib install guide page 2 of 31.
Tough rib sidelap detail and correct fasteners seating.
Tough rib roof panel fastener layout west read more.
Tough rib wall panel fastener layout.
Tuff rib panel installation specifications.
Strong 3 4 trapezoidal ribs enable installation over solid deck and open frame applications.
Place the leading edge of the first panel along this line.